Products
PRODUCTS DETAILS
Home > Products >
Expansive Demolition Grout 5kg Powder Mixes 1.2kg Water Silent Cracking Agent for Rock Breaking

Expansive Demolition Grout 5kg Powder Mixes 1.2kg Water Silent Cracking Agent for Rock Breaking

MOQ: 1x20GP
Price: Negotiation
Standard Packaging: 5kg moisture-proof bag with PE liner, 4 bags per export carton
Delivery Period: 7-15 days after deposit
Payment Method: T/T,L/C,Western Union
Detail Information
Place of Origin
Hunan, China
Brand Name
ECEROCK
Certification
ISO 9001:2015, MSDS, REACH Compliant
Model Number
EDG-512
Product Type:
Expansive Demolition Grout (Soundless Cracking Agent)
Mixing Ratio:
5kg Powder : 1.2kg Water
Water Content:
24% By Weight Of Powder
Bag Weight:
5kg
Recommended Hole Diameter:
38-42mm
Hole Spacing:
30-50cm
Hole Depth:
1-2m
Second Expansion Water:
0.5kg Per 1m Hole Depth
Re-watering Frequency:
Once Per Hour, 3 Times
Crack Initiation Time:
10-30 Minutes
Complete Breaking Time:
12-24 Hours
Expansion Pressure:
Up To 50 MPa
Working Temperature:
-5 C To 40 C
Shelf Life:
12 Months In Sealed Original Bag
HS Code:
38244000
Highlight:

5kg Grout 1.2kg Water Ratio

,

Soundless Rock Cracking Agent

,

Second Expansion Water Pouring Method

Product Description

Expansive Demolition Grout - Soundless Rock and Concrete Cracking Agent

A non-explosive, soundless demolition powder that cracks rock and reinforced concrete through controlled expansive pressure. No blasting license, no vibration, no fly rock, no noise. Ideal for quarry bench trimming, foundation trenching, tunnel widening, and urban demolition where explosives are not allowed.

Mixing Ratio: 5 kg Powder to 1.2 kg Water

The standard batch is 5 kg of powder mixed with 1.2 kg of clean water (about 24% water by weight). Mix slowly for 2-3 minutes until a smooth, lump-free slurry is obtained, then pour into the prepared holes within 10 minutes.

Critical warning: Never add extra water. Too much water will slow down the cracking reaction and reduce the expansion pressure dramatically, and the grout may never crack the rock. Measure the water, do not estimate it.

Second Expansion Method - Key to Full Power

After the rock starts to crack, the first reaction is only half of the job. Re-watering the hole drives a second expansion from the bottom up and opens the crack much wider:

  1. Wait until the rock surface shows visible cracks.
  2. Recharge water at a rate of 0.5 kg (1 jin) of water per 1 meter of hole depth - a 2 meter deep hole takes 1 kg (2 jin) of water.
  3. Pour the water into the hole and also along the cracks around the hole, until the water reaches the bottom of the hole. This lets the top and bottom of the hole expand together in a second reaction.
  4. Repeat once every hour, three times in total, to fully release the expansive capacity of the grout.

Follow this re-watering schedule and the crack gap becomes much wider, so the hydraulic breaker or wedge works with far less effort. The result is faster breaking, lower breaker wear, lower fuel and labor cost, and higher overall breaker efficiency.

Application Steps

  1. Drill holes 38-42 mm in diameter, spaced 30-50 cm apart, depth 1-2 m or 80% of the target height.
  2. Clean the holes with compressed air; the holes must be dry and free of dust and water.
  3. Mix 5 kg powder with 1.2 kg water and pour into the holes within 10 minutes.
  4. Re-water as described above every hour, three times, once cracks appear.
  5. Cracks normally appear in 10-30 minutes; full separation in 12-24 hours depending on rock hardness and temperature.

Technical Advantages

  • Expansion pressure up to 50 MPa, silent and vibration free
  • No explosive permit, no special transport, safe for urban and indoor sites
  • Wide crack opening reduces breaker working time and machine wear
  • Works from -5 C to 40 C with the correct grade selection
  • Non-toxic, non-flammable, water-soluble residue that washes away with rain

Packing and Storage

5 kg moisture-proof bag with PE liner, 4 bags per export carton. Store in a dry place, sealed, off the ground. Shelf life 12 months in original unopened packaging.

Buyer Reminder

Water control decides the result: 5 kg powder plus 1.2 kg water for the first mix, then 1 jin of water per meter of hole depth every hour, three times. Remember it, and remember it again - it is the difference between a fast, cheap break and a wasted day.